Shenyang Engineering Three proof Lamp It is a special waterproof, dust-proof and explosion-proof lamp, which is often used outdoors or in a worse environment. When installing the three proof lamps, it is necessary to master some skills and key points to ensure safety, stability and stability. Now let's introduce these skills and key points in detail.

1、 Select the appropriate location

First, you need to select the installation location. The installation position should be as close as possible to the place requiring lighting, and should be installed above enough to avoid being damaged by animals or other objects. The place where the engineering three proof lamp is installed should also be able to bear its weight and better support. The wall, ceiling and other supporting structures should be strong and stable enough. Therefore, sufficient evaluation and testing shall be carried out before installation to ensure that the position and support structure meet the requirements.

2、 Use appropriate tools and materials

Some special tools and materials need to be used when installing the three proof lamps. For example, it is necessary to use electrical special materials such as isolated power supply, cable conduit, cable connector, etc. In addition, special tools such as electric drills and hammers are also required. These tools and materials can greatly simplify the installation process and improve the installation efficiency.

3、 Suitable fixing method

The way to fix the three proof lamp is also very important. In general, appropriate mounting brackets and mounting screws should be selected. During installation, it shall be nailed to the building or other supporting structure to ensure the safety and stability of lamps. Attention should also be paid to the force and direction during installation to avoid damage to the lamps.

4、 Connect the wires correctly

In the process of installing the three proof lamp of the project, it is necessary to connect the wires correctly. The wires shall be treated with waterproof, fireproof and isolated electrical appliances, and the connection shall be stable and safe. All joints shall be wrapped in insulating tape or sheath to prevent accidental friction or other unexpected conditions.

5、 Test lamp performance

After installation, it is necessary to conduct performance test on the three proof lamps of the project. The test includes electrical test, waterproof test, dustproof test and explosion-proof test. Through test and inspection, the safety and stability of lamps in use can be ensured.

6、 Pay attention to safety

In the process of installing the three proof lamps, special attention must be paid to safety issues. Try to follow the safety regulations and precautions in the user manual. When wiring, the power shall be cut off first. Avoid confusion with other wires and cables to avoid short circuit and other problems. Keep concentration and calm during installation to avoid accidents.

The content of this article comes from the network. If you have any questions, please contact me to delete it!


 Shenyang Engineering Three proof Lamp

Recent browsing:

Service telephone:

024-25815838

Contact: Manager Ding

Tel: 15940588108

Tel: 13840299370

Service hotline: 024-25815838

Fax: 024-25815007

Address: No. 1105, Zhangshi Lantern City, Tiexi Economic Development Zone, Shenyang

Case presentation +